Aircraft Assembly Scheduling Problem Considering Material Arrival Time Constraints
YU Zhi-qiang, XIE Min, KUANG Lin, WANG Pan, GE Zhi-bing
Manufacturing Automation . 2024, (8): 149 -154 .  DOI: 10.3969/j.issn.1009-0134.2024.08.021