Trajectory Planning for an 8-DOF Rock-Drilling Robotic Arm Based on the DE-ABC Algorithm

DONG Ke-jian, GAO Teng, LI Xu-yang

PDF(3512 KB)
PDF(3512 KB)
Manufacturing Automation ›› 2026, Vol. 48 ›› Issue (1) : 155-163. DOI: 10.3969/j.issn.1009-0134.2026.01.017

Trajectory Planning for an 8-DOF Rock-Drilling Robotic Arm Based on the DE-ABC Algorithm

    {{javascript:window.custom_author_en_index=0;}}
  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}. 2026, 48(1): 155-163. https://doi.org/10.3969/j.issn.1009-0134.2026.01.017

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(3512 KB)

Accesses

Citation

Detail

Sections
Recommended

/